Installation: Fontana Trieste (4 parts) (Item no 771)
    click

    Item List

    771 Fontana Trieste (4 parts)
    H=135cm W=87cm Dia=48cm
    Weight=162,5kg
    1x31Repina Putto (large)
    1x865Repina Elevator (with hole)
    1x769Trieste Stand
    1x770Bacino Trieste
    1x913Waterfall 700 Pump

    Materials Needed

    1m Hosepipe 20mm Diameter
    8 Wooden Wedges (10mmx50mm)
    Plastersand and Cement
    3mm Masonary Drillbit
    1 Elbow 12mm
    1 Small Tube of Silicone Sealant

    Tools

    Trowel
    Spirit Level

      Thank-you for purchasing a Gardens of Italy quality product. We would like to make installation as easy as possible for you with this installation pamphlet, so that you can enjoy this magnificent water feature in your setting.

        Installation

      1. A power outlet must be established near the fountain. To ensure safety regulations are met an electrician is needed to assist with the running of the conduit pipe from the connecting box to the electrical distribution point.
      2. Make sure the fountain is placed on ground that is compact and level.
      3. Place the Trieste stand (769) onto compacted ground.
      4. Drill a hole in the Bacino Trieste (770) for pump cable to go through.
      5. Position the Bacino Trieste (770) ontop of the Trieste Stand (769) using the wooden wedges to level it.
      6. Once level, apply Cement between the Bacino Trieste (770) and Trieste stand (769). Once dry, remove wooden wedges and fill void with Cement.
      7. Feed cable through Trieste Stand (769) and Bacino Trieste (770). Seal both holes with Silicone Sealant to prevent backflow.
      8. Place Repina Elevator (865) into the middle of Bacino Trieste (770) and cement together.
      9. Place Waterfall 700 Pump (913) into Repina Elevator (865) and connect to hosepipe coming out of Elevator.
      10. Place Repina Putto (31) ontop of Elevator (865).
      11. Feed hosepipe through the Repina Elevator (865) and Repina Putto (31). Seal bottom of Putto and hosepipe with silicone sealant to prevent back flow.
      12. Allow 24hrs for Silicone and Cement to dry before filling fountain with water.

        Please also look at the Installation Diagram for help!