Installation: Fontana Murale (two parts) (Item no 425)
    click

    Item List :

    425 Fontana Murale (two parts)
    H =128cm W =107cm
    Weight =365kg
    1x426Fontana Murale (top only)
    1x427Fontana Murale (halfdam)
    1x913Waterfall 700 Pump

    Materials Needed :

    3x 90'elbows 12mm
    2x M8x120mm Fisher Plugs
    Hosepipe

    Tools Needed :

    Hammer
    Angle Grinder
    Hammer Drilling Machine
    8mm Masonary Drill Bit
    14mm Masonary Drill Bit

      Thank-you for purchasing a Gardens of Italy quality product. We would like to make installation as easy as possible for you with this installation pamphlet, so that you can enjoy this magnificent water feature in your own setting.

        Installation :

      1. Place Fontana Murale Halfdam (427) on the floor against the wall.
      2. The electrical connecting box must be situated near to the dam. The Waterfall pump must be placed in the halfdam and the pump wire must be fed through the hole in the bottom of the Murale Dam (427), allowing for enough slack, and then silicone sealed around the hole.
      3. Find the centre of the dam and grind a slot in the wall, from the top of the dam, to the spout on the Murale Top (426).
      4. Place hose piping into the slot and on each end attach a 90'elbow. Where the Murale halfdam (427) and Murale Top (426) join, another elbow must be attached.
      5. Place Murale Top (426) ontop of the Murale Dam (427).
      6. Use fisher plugs to secure the top parts onto the wall. On either side of the spout drill holes using a 8mm drill bit. Countersink the holes +-5mm deep using a 14mm drill bit. Insert the fisher plugs using a hammer, until near towards the end use a screwdriver so as not to damage the plaque.
      7. Attach hose piping to Waterfall pump.


      Please also look at the Installation Diagram for help!