Installation: Fontana Medea (Item no 592)

    click

    Item List

    592 Fontana Medea
    1x593Fontana Medea Top
    1x594Fontana Medea Basin
    1x595Fontana Medea Base
    1x913Waterfall 700 Pump

    Materials Needed

    1.2m Hosepipe
    3x 90' 12mm Elbows
    2x M8x100mm Fisher Plugs
    Plastersand and Cement
    Small Tube of Silicone Sealant

    Tools

    Angle Grinder
    Hammer Drilling Machine
    8mm Masonary Drill Bit
    14mm Masonary Drill Bit

      Thank you for purchasing a Gardens Of Italy quality product. We would like to make installation as easy as possible for you with this installation pamphlet, so that you can enjoy this magnificent water feature in your own setting.

      Installation :

    1. Choose a level area where you can place your Fontana Base (595) on the ground. Ensure ground is level, if the ground is loose it has to be compacted.
    2. Grind a slot into the wall +/_ 20mm wide x 20mm deep.
    3. Cut flexible 12mm hose to 15mm size then place 90' elbow on top and bottom of hose.
    4. Then place Fontana Basin (594) on top of base, the hose should be chased into wall.
    5. Silicone seal bottom section of elbow that comes through the basin.
    6. Attach hosepipe from elbow to pump.
    7. Ensure that when laying Conduit Pipe for fountain that you consult a electrcian. An electrician should also be consulted to find a suitable place for waterproof connection box.
    8. Then place Fontana Medea Top (593) over top elbow. Make sure that your elbow is the correct height in order for the water to flow from the rossette.
    9. You then need to drill 8mm holes on either side of the rossette.
    10. Using a 14mm drill bit you can countersink your 8mm holes +/- 5mm deep.
    11. Insert your fisher plugs using your hammer. Ensure not to knock them completely in the last bit you can use a screwdriver to secure the fisher plugs.
    12. Let silicone seal dry for 24 hours.
    13. Fill your fountain with water so that you can adjust your pump to the desired water pressure.
    14. The third elbow is to be put on last on top of elbow at rossette.
    15. If you desire to put on a optional tap please consult your plumber.


      Please also look at the Installation Diagram for help!