Installation: Fontana Coppia Ghedi (Item no 851)
Installation: Fontana Coppia Ghedi (Item no 851)
Item List : |
| 851 Coppia Ghedi |
| H =123cm W =72cm |
| Weight =269kg |
| 1x | 423 | Fontana Pegola |
| 1x | 384 | Coppia Ghedi |
Materials Needed : |
| Plastersand and cement |
| Waterfall 700 Pump |
Tools Needed : |
| Spirit Level |
Thank-you for purchasing a Gardens of Italy quality product. We would like to make installation as easy as possible for you with this installation pamphlet, so that you can enjoy this magnificent water feature in your own setting.
Installation :
- Make sure ground has been compacted and is level.
- This fountain must be placed against the wall and an electrical box must be situated close by.
- Place Fontana Pegola (423) onto the ground, make sure it stands level.
- Place the Waterfall 700 Pump into the Fontana Pegola (423) and cover with the pump housing cover. Make sure there is enough slack allowed.
- Place Coppia Ghedi (384) onto Fontana Pegola (423) and where the hosepipe sticks out at the bottom, connect to the pump. Cement together.
Please also look at the
Installation Diagram
for help!