Installation: Fontana Bimba/Bimbo (Item no 228/229)
Installation: Fontana Bimba/Bimbo (Item no 228/229)
Item List: |
| Bimbo/Bimba Fountain |
| 1x | 231 | Bimbo or Bimba with Pipe |
| 1x | 230 | Fontana Base |
| 1x | 129 | Fontana Bacino (one hole) |
| 1x | 913 | Waterfall 700 Pump |
Materials Needed: |
| Hose Pipe 12mm Diameter |
| Wooden Wedges |
| Plastersand and Cement |
| 250ml White PVA Paint |
| Small Tube of Silicone Sealant |
Tools Needed: |
| Hammer |
| Trowel |
| Paint Brush |
Thank you for purchasing a Gardens of Italy quality product. We would like to make installation as easy as possible for you with this installation pamphlet, so that you can enjoy this magnificent water feature in your own setting.
Installation :
- Level area for Fontana Base (230) and place into position. Cement Fontana Bacino (129) to base, using wooden wedges to level it. Install the Pump (913) and feed the electrical cord through the hole in the base. Silicone seal the small hole of the Bacino, as well as the hole in the base. This will prevent water leaking down the base to cause short circuit.
- When installing the Bimbo/Bimba use a short length of hose to connect the Pump with the copper pipe of the statuette. The statue should not be cemented into place, to enable later servicing of the pump.
- After the cement has set, the wedges can be removed and the holes left - filled in. The joints can now be smoothed down and wrapped in wet sponge or felt as well as plastic to aid the curing process. This wrapping should be left on for 24 hours, after which the joints can be painted over.
Please also look at the
Installation Diagram
for help!